Health Post – Chautara
| Chautara Health Post Construction | |
|---|---|
| Location: | Chautara, Sindhupalchowk |
| Institution: | Nepal Ministry of Health and Population, Government of Nepal |
| Project: | ANMF has formed a special relationship with the Nepal Ministry of Health and Population to rebuild eleven health posts in rural Nepal damaged by the 2015 earthquake.
On 25th April 2015, A devastating magnitude 7.8 earthquake struck Nepal. On 12th May 2015, a large aftershock with a magnitude of 7.3 incurred more losses of lives and infrastructure. Fourteen districts were hardest hit by the earthquake namely – Sindhupalchowk, Nuwakot, Dhading, Gorkha, Rasuwa, Kavre, Bhaktapur, Lalitpur, Dolakha, Makwanpur, Ramechhap, Okhaldhunga, Sindhuli and Lamjung. Due to this devastating earthquake more than 8600 people lost their lives and 16,808 were injured. More than 2000 major surgeries were performed. A total of 408 health posts (HP), 10 primary health care centers(PHCC), 8 hospitals, 27 Ayurveda ausadhalaya/centre were completely damaged. In addition, 565 HPs, 62 PHCC, 33 hospitals, and 26 Ayurveda Centers were partially damaged. These events have created an interruption in health service delivery which may reverse the achievements that we made in the past. Additionally, there is high risk of disease outbreak in absence of immediate and adequate preparedness. Ministry of Health and Population (MoHP) endorsed the post earthquake "Health sector recovery plan" to strengthen the health service delivery in this state of emergency where America Nepal Medical Foundation sprang into action by signing a memorandum of understanding (MOU) with the MoHP on 23rd June, 2015. We were amongst the first Non governmental Organization (NGO) to sign an MOU with the Government. ANMF team proposed to build 11 Prefab health posts in partnership with the Government of Nepal and local people in the earthquake affected district of Sindhupalchowk, Nepal. The purpose of this partnership is to resume a robust and resilient health system at the affected areas in short period of time and regain confidence of public and health workforce at large. Irkhu has been added as a twelfth health post. Duipipal has been added as a thirteenth health post. |
![]() |
|
| Institution: | Nepal Ministry of Health and Population, Government of Nepal |
| Location: | Kathmandu |
![]() |
|
| Title: | Health Post Construction |
| ID: | 15MOHP001d |
| Type: | Funded Project |
| Date: | 26 June 2015 |
| Grant: | $500,000 |
| Funded: | $500,000 |
| Nepal Manager: | Dr Bhagawan Koirala |
| USA Manager: | Dr Sunil Sharma, Dr Bijay Acharya |
| Details: | ANMF has formed a special relationship with the Nepal Ministry of Health and Population to rebuild eleven health posts in rural Nepal damaged by the 2015 earthquake. The Chautara health post is a Type 1 Health Post (15.6m x 7.9m x 2.7m). Irkhu has been added as a twelfth health post. Duipipal, Nuwakot has been added as a thirteenth health post. |
| Chautara Health Post Construction | |
|---|---|
| 8 Feb 18 | Letter provided by Ministry of Health regarding the handover of the prefabricated health posts across Sindhupalchowk district. |
| 16 Nov 17 | The vendor (Building Solution: Marmoleum flooring) has repaired the flooring on the health posts where it was damaged. |
| 15 Nov 17 | ANMF/Nepal received the handover letter as well as the letter of gratitude from District Health Office, Sidhupalchowk. ANMF/Nepal team along with Er.Pashupati Shah (Fixit Engineering Pvt. Ltd.) visited Chautara type 1 prefabricated structure which is now being used as an emergency ward at Chautara District Hospital. |
| 27 Jan 17 | Report received from ANMF/Nepal. Some additional problems have been noticed after the handover such as damaged marmoleum flooring, broken windows and toilet commode, solar problems, etc. |
| 11 Dec 16 | ANMF/USA has set aside an additional $50,000 for maintaining and strengthening ANMF rebuilt health posts in response to report from ANMF/Nepal. |
| 2 Oct 16 | Update on health posts. |
| 7 Aug 16 | ANMF accounting for health post project. |
| 31 Jul 16 | Expense report received. |
| 21 Jul 16 | Report received regarding health posts handover ceremony. |
| 2 Jul 16 | Health post handed over to Nepal government. |
| 21 Jun 16 | Report received. |
| 15 Mar 16 | $150,000 sent to ANMF/Nepal for 15MOHP001 (11 health posts). |
| 5 Feb 16 | Report received. The health post has been handed over to Ministry for operation. Till date the Chautara Health Post stands as the only health post handed over by any agency under Health Sector Recovery Plan. |
| 1 Oct 15 | Report received. |
| 22 Aug 15 | Chautara health post completed (see report). |
| 14 Aug 15 | Chautara health post construction commenced. |
| 27 Jul 15 | $200,000 sent to ANMF/Nepal for 15MOHP001 (11 health posts). |
| 16 Jul 15 | Construction under way. |
| 12 Jul 15 | Rebuilding work started. |
| 12 Jul 15 | Project approved by ANMF/USA Board. |
| 5 Jul 15 | ANMF signed contract with Fix It Engineering Ltd. |
| 2 Jul 15 | Memorandum of understanding signed with Ministry of Health and Population (page 1, 2, 3, 4). |
| 17 Jun 15 | $100,000 sent to ANMF/Nepal for 15MOHP001 (11 health posts). |
| 31 May 15 | Approved by Earthquake Emergency Committee. |
| 27 May 15 | Approved by Projects Committee. |
| Chautara Health Post Construction | |
|---|---|
| 14 Nov 2017 Structure now being used as emergency ward | |
| 3 Jun 2016 Interview with ANMF/Nepal President | |



















