Public Health – Dhulikhel
| Public Health | |
|---|---|
| Location: | Dhulikhel |
| Institution: | Dhulikhel Hospital |
| Project: | Joint project of ANMF & Dhulikhel Hospital – create an Outbreak Prevention and Management Unit at Dhulikhel Hospital to plan, coordinate and implement activities for the prevention, immediate management and containment of outbreaks in the communities through the existing outreach centers of Dhulikhel Hospital. |
![]() |
|
| Institution: | Dhulikhel Hospital |
| Location: | Dhulikhel |
![]() |
|
| Title: | ANMF & Dhulikhel Hospital Outbreak Prevention, Intervention, Treatment & Public Health Education |
| ID: | 15DH003 |
| Type: | Funded Project |
| Date: | 12 July 2015 |
| Grant: | $26,790 |
| Funded: | $26,790 |
| Nepal Manager: | Dr Prativa Pandey |
| USA Manager: | Dr Sangita Basnet |
| Public Health | |
|---|---|
| 7 Jul 15 | Approved by Projects Committee |
| 12 Jul 15 | Approved by ANMF Board |
| 27 Jul 15 | $26,790 sent to ANMF/Nepal |
| 31 Jul 15 | Memorandum of understanding signed with Dhulikhel Hospital. |
| 31 Jul 15 | $26,790 transferred to Dhulikhel Hospital. |
| 5 Aug 15 | Report received. |
| 2 Oct 15 | Report received. |
| 18 Oct 15 | Report received. DH provided medical treatment and outbreak prevention activities to thousands of sufferers living in 18 rural villages and its vicinities through its outreach centres.
1. Community coordination and management committee formation 2. Construction site evaluation and design development 3. Water Tank Delivery 4. Base construction and installment of pipe system There had been few challenges like landslide in Melamchi highway, landslide on the way to Bolde, month long Madhesh andolan and now undeclared Indian restriction which has slow the progress of work. However, we are very committed and hopeful that we will be able to finish on time. |
| 27 Mar 16 | Report received.
At Bansbari – water tank base construction and installation have been completed. At Bolde – water tank base construction and installment have been completed At Baluwa – community coordination and management committee formation has been done. Water tank has been delivered to the Baluwa. Base construction and installation of pipe system is in process. At Thansing – coordination with community has been done. The construction site has been evaluated and design has been made. Water tank delivery is in the process. |
| 23 Jun 16 | Report received. At Bansbari safe drinking water tank installment has been completed. At Bolde safe drinking water distribution system has been established in Bolde with 5 water tanks, base and connecting pipes. At Baluwa water distribuition system is being installed. At Thansing water tank is being installed in five places. |
| 24 Dec 16 | Of the four sites, construction work is still not completed at Thansingh and Baluwa. Remarkable works were done at Bolde VDC, Kavre district and almost 80-85 households are receiving drinking water from proper facilities. ANMF/Nepal will follow up and do site visits. |
| 27 Jan 17 | Report received from ANMF/Nepal.
Baruwa, Sindhupalchowk – Still in progress. The previous water source dried up and a new source had to be searched. Bansbari/Bahunepati, Sindhupalchowk – Already installed and local villagers are benefiting from it. Reports are yet to be received. Thansing, Nuwakot – Already installed and local villagers are benefiting from it Reports are yet to be received. Bolde, Kavre – Already installed and local villagers are benefiting from it Local villagers are requesting to upgrade the water supply system. |
| 27 May 17 | This project is complete but the final reports and the remaining bills have not yet been submitted to ANMF/Nepal. |
| 23 Jul 17 | Final report received. "With the support of the American Nepal Medical Foundation, we could establish two, one medium and one small scale, water collection and distribution system at rural communities of the Dhulikhel outreach catchment area. Similarly, we could establish the small reservoir serving the cluster of houses and restored the medium level water tank reservoir in the rural communities. All of our works are done with active involvement of the community member as well as the stakeholders, thus help to build trust and good relation with local communities." |
| 13 Aug 17 | Project closed by ANMF Board. |
| 10 Sep 17 | Letter received from Dhulikhel Hospital. |
| Public Health | |
|---|---|
| 23 June 2015 – Memorandum of Understanding | |
![]() |
|
| 2 October 2015 – Leveling of earth for base Bansbari | |
![]() |
|
| 2 October 2015 – Stone pavement for base Bansbari | |
![]() |
|
| 2 October 2015 – Water tank delivery Bansbari | |
|
|
| 27 March 2016 – Community installing water tank and pipes | |
|
|
| 27 March 2016 – Trail of the pipe system | |
|
|
| 27 March 2016 – Water tank installation at Bahunepati | |
|
|
| 23 June 2016 – Baluwa and Thansing | |
|
|
| December 2016 Bolde, Kavre District | |
|
|
| December 2016 Water tanks at Baruwa, Sindhupalchowk District | |
|
|
| 10 September 2017 Letter from Dhulikhel Hospital. | |
|
| Public Health | |
|---|---|
| 3 Jun 2016 – Interview with ANMF/Nepal President | |
| 30 April 2017 – ANMF/Nepal Report | |