| Temporary Structure at Chautara Hospital |
|
| 16 Aug 19 |
ANMF/Nepal reports: All the health services have been continuing in Chautara. As we have handed over the structure and now we paid the 5% retention to Fixit Engineering Pvt. Ltd. The project now has been completed. |
| 22 Sep 18 |
ANMF/Nepal reports: We have successfully conducted the handover ceremony of “a prefabricated structure at Chautara”. The program was succesfully conducted with the presence of our honorable State Minister for Health and Population Dr. Surendra Kumar Yadhav along with other government officials. ANMF team with the help of Chautara district hospital staffs succesfully conducted the program which was held on 22nd September 2018. |
| 12 Aug 18 |
Project completed and closed by ANMF/USA Board. |
| 8 Aug 18 |
The prefabricated structure has been of great help for delivering the health care services through the district hospital as informed by Dr. Poma (District Health Officer, Sindhupalchowk district). Dr. Poma is very thankful towards the contribution of ANMF.
A local villager living in Chautra Municipality said "during the earthquake we received the health care services in an open air with us lying on the table but now it has been far better than before".
The Chautara District Hospital has been receiving following average number of patients:
- Outpatient department: 60-70 patients daily
- Inpatient department: 10 patients
- Emergency department: 15-20 patients
The hospital has 15 beds in total and it has been providing good laboratory services, nutritional rehabilitation services (especially for children and women), as well as other health care services. |
| 3 Jun 18 |
Handover letter received from the government. The construction of Chautara prefabricated structure has been completed and the hospital has already started delivering health care services through the newly constructed prefabricated structure. |
| 2 May 18 |
Update from ANMF/Nepal on utilization of health posts. |
| 1 May 18 |
Update from ANMF/Nepal: The construction work has already been completed but some of the repair and finishing works were remaining as suggested by the monitoring team from Project Coordination Unit, Ministry of Health. The remaining work, including repair and finishing work, has been completed and the report has been submitted to Project Coordination Unit (Ministry of Health). ANMF/Nepal is awaiting a letter of response from Ministry of Health so that ANMF can conduct a formal handover ceremony. |
| 6 Apr 18 |
The construction work has been already completed but some of the repair and finishing works were remaining as suggested by the monitoring team from Project Coordination Unit, Ministry of Health. The remaining work, including repair and finishing works, have been completed and the report has been submitted to Project Coordination Unit (Ministry of Health). ANMF/Nepal is awaiting a letter of response from Ministry of Health so that ANMF can conduct a formal handover ceremony. |
| 3 Mar 18 |
Report received from ANMF/USA President's visit to Chautara Hospital. |
| 28 Feb 18 |
ANMF/Nepal and ANMF/USA members visited Chautara Hospital who are now running their clinics and inpatient units including their ER within the ANMF built units. It is nice too see them inside four walls instead of torn tents. The new District Health Officer informed us that soon ANMF built clinic unit will also be their main delivery center where they will be delivering over 10-15 babies a month. |
| 30 Jan 18 |
Construction of Chautara prefabricated structure is completed. |
| 27 Dec 17 |
Certificate provided by National Reconstruction Authority for the construction of the health posts and a bigger prefabricated structure in Sindhupalchowk district. |
| 3 Dec 17 |
Previously $66,000 had been transferred to Nepal for this project. Construction started by Fixit Engineering on 4 November 2017. Due to increase in costs, $22,000 extra has been requested. Board unanimously approved to disburse this extra fund and agreed to use unused funds previously disbursed ($50,000) for maintenance of health posts (16MOHP002). |
| 15 Nov 17 |
Construction work has been started. Dr. Subhash along with Er. Pashupati Shah (Fixit Engineering Private Limited) initiated the construction work on 4th November 2017. |
| 4 Nov 17 |
Videos of construction inauguration and earlier project (15MOHP001d) now being used as emergency ward. |
| 30 Oct 17 |
Construction contract (1,2,3) signed with Fix It Pvt. Engineering Ltd. |
| 10 Oct 17 |
Construction approval received from Ministry of Health and Population. |
| 7 Aug 17 |
Architectural designs have been submitted to Ministry of Health and Population and ANMF/Nepal is awaiting MoHP’s approval. |
| 23 Jul 17 |
Structural designs of the proposed prefabricated building have been approved by Ministry of Health and Population. Currently working on architectural designs of the proposed building. |
| 26 Jun 17 |
$66,000 transferred to ANMF/Nepal. |
| 20 Jun 17 |
Project approval (1, 2) received from Nepal Social Welfare Council. |
| 18 Jun 17 |
The tripartite agreement has been signed between National Reconstruction Authority (NRA i.e. 1st party), Ministry of Health and Population (MoHP i.e. 2nd party) and America Nepal Medical Foundation-Nepal (ANMF-N i.e. 3rd party) ANMF is awaiting the approval from the Rehabilitation and Reconstruction Committee at MoHP regarding the structural design and analysis which was submitted by ANMF. |
| 16 Apr 17 |
To construct Chautara hospital structure, District Health Office has allocated land. The prefabricated structure, including an emergency room, a male ward and a female ward, has been designed and submitted to Ministry of health for final approval while waiting for Social Welfare Council approval as well. Once approved, construction will start. |
| 21 Dec 16 |
Fund Assurance Letter sent to ANMF/Nepal. |
| 18 Dec 16 |
Project approved by ANMF/USA Board. |
| 10 Dec 16 |
Project proposal received by ANMF/USA. |